1)Water Hammer Projects:-

No.

Project Name

Pipeline data

Length/Diameter

Pump Data

Flow/Head(m)

Surge  Volume

1

BURIEDA

15520 m/ 450 mm

22.5L/s/ 75

20 m3

2

ABBIS

5500 m/ 315 mm

38.9 l/s / 35

17 m3

3

AL-Asher Men Ramadan

3870 m/ 1000 mm

435  l/s / 30

-

4

ORASCOM North Cost DABAA

26 km/ 700 mm

347L/s/ 30

-

5

EBNY BETAK

4.7 km/ 800-600 mm

245 l/s / 62

30 m3

6

MASRAF Al-WADY – FAYUM

7240 m/ 1200 mm

1000 l/s / 55.8

95 m3

7

EL-DELINKAAD

network/ 800 mm

425 l/s / 80

55 m3

8

JUHAINA

8300 m/ 700 mm

150 l/s / 35

10 m3

9

New NUBARIA

10183 m/ 600 mm

105 l/s

-

10

GABAL SHESHA

10425 m/ 600 mm

175 l/s / 100

15 m3

11

Al-HELAL Al-AHMAR

900 m/ 150 mm

15 l/s / 35

1.5 m3

12

El-KOSEYA

network/ 700/1400 mm

400 l/s / 35

75 m3

13

ABNOB & El-FATH

network/ 1000 mm

400 l/s / 60

45 m3

14

Min Sid Ahmed WWTP

(Abo Homos)

2484 m/ 250 mm

25 l/s / 28

1.2 m3

15

Sewage project for the King Mohammed

1730 m/ 600 mm

140 l/s / 20

20 m3

16

El-ALAG

19000 m/ 700 mm

225 l/s / 2

18 m3

17

El-SANTA

network/150 mm

500 l/s / 60

75 m3

18

EL-MARAGHA

20478 m/ 800 mm

125 l/s

22 m3

19

ZEMAM MAAKHATH 16 project

network/ 1400 mm

1500 l/s / 30

32 m3

20

SAMALLOT

14725 m/ 1200 mm

230 l/s / 37

100 m3

21

TEMMA

5650 m/ 800 mm

250 l/s / 45

11 m3

22

CAIRO FESTIVAL CITY

2173 m/ 500 mm

160 l/s / 55

20 m3

23

MAHALLAT  MOUSA VILLAGE – KAFR EL-SHEIK

5814 m/ 700 mm

170 l/s / 24

-

24

KARKAR VILLAGE – TAWTEEN

6800 m/ 400 mm

100 l/s / 34

-

25

SIDI ABDULRAHMAN BOOSTER

15.55 m/ 700 mm

347.2 l/s / 75

-

26

ZEZENYA INDUSTRIAL

3702 m/ 600 mm

212 l/s / 51

-

27

UP TOWN AL-MOKATTAM (EMMAR LEVERAGES)

3950 m/ 800 mm

200 l/s / 100

-

28

AL-SHAGAREYA JUNGLE – BANY SWEF

3500 m/ 300-600 mm

200 l/s / 50

60m3

29

MORSY

425 m/ 200 mm

354 l/s / 120

-

30

TEMMA – BANY SWEF

10.6km/ 400 mm

240 l/s / 55

100 m3

31

AL-AYSHA STATION – AL- GHARBEYA

500 m/ 200 mm

32 l/s / 14

-

32

MAIN GHARBEYA

3500 m/ 450 mm

70 l/s / 21

22 m3

33

NORTH COST BOOSTERS DABAA

26 km/ 1000 mm

160 l/s / 75

45 m3

34

FUKA

5.5 km/ 1000 mm

347.2 l/s / 75

85 m3

35

EBNY BETAK – 6TH OF OCTORBER

8.34 km/ 1200-900 mm

620 l/s / 44

85 m3

36

SAMALLOT CITY

1600 m/ 300 mm

90 l/s / 26

26 m3

 

2)WASTE WATER PLANET PROJECTS

No.

Project Name

Capacity

Task

1

Extension of QENA

55000 m3/d

Design and specification of:-

·      2 primary settling 35m diameter

·      4 secondary settlingtanks 31m diameter

·      2 thickener tank

2

SHARNOUB

11520 m3/d

Design and specification of:-

·      4 finalsettlingtanks  35m diameter

·      2 thickener tank

3

ABO RAWASH

400000 m3/d

Design and supervising on instillation of:-

·      Inlet screen pump

·      Screen & grit removal tank

·      Primary settlingtank

·      Sludge pump station

·      Intermediate lift station

·      2 thickener tank

 

3)POTABLE WATER TREATMENT PLANETS

No.

Project Name

Capacity

Task

1

ABO HOMMAS

900 m3/h

Design and specifications of 2 Clariflocculator 30m diameter

2

ABO QURKAS

6480 m3/h

Design and  specifications of 6 Clariflocculator 41m diameter

3

AL - SAF

2520m3/h

Design and  specifications of:-

·      2 Clariflocculator 41m in diameter

·      2 thickener (36.7 min diameter)

4

AL – CANTARA GHARB

1080 m3/h

Design and specify of:-

·      2 Clariflocculator 22.3 m diameter

5

AL MANSHEYA (2)

10000  m3/h

Design and  specifications of:-

·      2 Clariflocculator 16.7x14.8x45 m

·      2 thickener 16.5x70mx14.83m

6

HOSH ISSA

2520  m3/h

Design and  specifications of 2 Clariflocculator 35 m diameter

7

DAMARO

5040  m3/h

Design and  specifications of 4 Clariflocculator 36.7 m diameter

8

TANTA

5040  m3/h

Design and  specifications of 4 Clariflocculator 33.6 m diameter

9

SODFA & GHANAYEM

2160m3/h

Design and  specifications of:-

·      2 Clariflocculator 33.6 m in diameter

·      2 thickener 9 m diameter

10

ABNON & EL-FATH

5760m3/h

Design and  specifications of:-

·      Distribution shaft 4m in diameter

·      4 Clariflocculator 29.3 m in diameter

·      2 thickener 6 m diameter

11

JOHAYNA

2880  m3/h

Design and  specifications of:-

·      2 Clariflocculator 28.2 m diameter

12

SAQULTA

2125  m3/h

Design and  specifications of:-

·    Mech – screen

·    Ram water P.S → 6 pumps

Q = 360 L/S @ 17m

·    Distribution shaft 3.5m

·     4 Clariflocculator 31.7m in diameter

·    10 sand filter 8x6

·    2 underground tanks 29x55.8

·    Chemical building

·    Thickener tank 13m   diameter

·    Transformer & Generator

 

4) PUMP STATION POJECTS

No.

Project Name

Capacity ( m3/h )

Head (m)

No. of

Pumps

Power Source

1

EBNY BETAK

6TH OCTOBER PS.1

65 L/S

36

2 work

2 stand by

·        Transformer 300 KVA

·        Generator 250 KVA

2

EBNY BETAK

6TH OCTOBER PS.2

65 L/S

26

2 work

2 stand by

·        Transformer 300 KVA

·        Generator 315 KVA

3

EBNY BETAK

6TH OCTOBER PS.3

275 L/S

45

4 work

2 stand by

·        Transformer 1500KVA

·        Generator 1000 KVA

4

EBNY BETAK

6TH OCTOBER PS.4

Cost Boosters

245 L/S

67

2 work

2 stand by

·        Transformer 1000KVA

·        Generator 1000 KVA

5

NORTH COST CITIES (ORASCOM GROUP)

Our task

1)works shop drawing for P.S & Tanks

2)P&ID diagram

3)Piping Layout

4)Ventilation Design

1250  m3/h

75 m

 

 

6

BENJA

97  L/S

30

2 work

2 stand by

·        Transformer 300 KVA

·        Generator 255 KVA

7

BANI SHEBL

10  L/S

10

1 work

1stand by

·        Transformer 50 KVA

·        Generator 50 KVA

8

BANI AMMAR

45  L/S

21

1 work

2stand by

·        Transformer 300 KVA

·        Generator 250 KVA

9

AL-AKADMA

125  L/S

50

2 work

2 stand by

·        Transformer 500 KVA

·        Generator 500 KVA

10

EL – GABAl AL-ASFAR

114  L/S

100

·         Electric

·         Diesel 

Transformer

800 KVA

11

AL-MENYA

300 L/S

40

2 work

2 stand by

1x960 KVA generator

12

AL-SHOROFA

120 L/S

17

1 work

1 stand by

·        Transformer 250KVA

·        Generator 950 KVA

13

NOWEEBAA

80 L/S

90 m

3 work

1 stand by

 

14

DESHNA

50 L/S

40

1 work

1 stand by

1        main

·        Transformer 500 KVA

·        Generator 230 KVA

15

AL-HELAL

AL-AMAAR Village

20 L/S

45

1 work

1 stand by

·        Transformer 100 KVA

·        Generator 700 KVA

16

RASHID

32 L/S

23

2 work

1 stand by

·        Transformer 100 KVA

·        Generator 80 KVA

17

Main EL-AKAAB

EL-HELAL

EL-AHRAM

ASWAN

15 L/S

35

1 work

1 stand by

·        Transformer 100 KVA

·        Generator 100 KVA

18

BERKASH

55 L/S

75

2 work

2 stand by

·        Transformer 500 KVA

·        Generator 225 KVA

19

EL-MANSHEYA

EL-GEDEDA

26 L/S

15

1 work

2 stand by

·        Transformer 100 KVA

·        Generator 100 KVA

             

 

5) BUILDING SERVICE PROJECTS

No.

Project Name

The Owner

Task

Year

1

Show Room

(AL-MOHANDESEEN)

DAMAC

·   Electrical Equipment Design

·   Design of firefighting system

·   HVAC Design

2009

2

Youth Hostels

(MARSA MATROUH)

Youth Ministry

·   Electrical Equipment Design

·   Design of firefighting systems

·   HVAC Design

·   Pluming systems

2009

3

Youth Hostels

(AL-FAYOUM)

4

Youth Hostels

(RAS SEDR)

5

PICORP Resort

(MARSA ALAM)

PICORP Resort

(MARSA ALAM)

·   Pluming systems

2009

6

SHELGHADA Hotel

(HURGHADA)

SHELGHADA Hotel

(HURGHADA)

·   Electrical Equipment Design

·   Design of firefighting system

·   HVAC Design

·   Pluming systems

2009

7

 

 

 

Sinai Higher Institute for Tourism and Hotels

Sinai Higher Institute for Tourism and Hotels

·   Electrical Equipment Design

·   Design of firefighting systems

·   HVAC Design

·   Pluming systems

2009

8

Faculty of Computer

Ain Shams University

AIN SHAMS University

·   Electrical Equipment Design

·   Design of firefighting system

·   HVAC Design

·   Pluming systems

2009

9

International Export Center

 (Ware House No.1)

International Export Center

·   Electrical Equipment Design

·   Design of firefighting systems

·   HVAC Design

·   Pluming systems

2009

10

Cairo Festival city

Al-Futaim Company

·   Electrical Equipment Design

2010

11

RKW Plant

RKW Plant

·   Electrical Equipment Design

·   Design of firefighting systems

·   HVAC Design

2010

12

EL-NAKADA

Egyptian Company for Wholesale Trade

·   Design of firefighting systems

2010

13

AL_TOOD

14

ESNA Ware House

15

RABEGH Landfill Project

RABEGH Landfill Project

·   Electrical Equipment Design

·   Pluming systems

·   Irrigation design

2010

16

BOSTIK Plant

BOSTIK Plant

·   Electrical Equipment Design

·   Design of firefighting systems

·   HVAC Design

2010

17

Air Liquid Plant

Air Liquid Plant

·   Design of firefighting systems

2010

18

Summer Incubator

AIN SHAMS

Specialist Hospital

·   Design of firefighting systems

2011

19

Day Care Unit

2011

20

C.C.U

2011

21

Airline Tower of HURGHADA Airport

Arab Contractors Company

(Branch of the General Administration of consulting engineering and technical services)

·   Electrical Equipment Design

·   Design of firefighting systems

·   HVAC Design

2011

22

New Cairo Building

(V.I.P - Building)

BARWA CO.

·   Electrical Equipment Design

·   Design of firefighting systems

·   HVAC Design

·   Pluming systems